Skip to content
Central plant mechanical room with chillers and insulated piping

Existing Buildings

Where we go deepest

Getting more from the building you already own

Most opportunity lives in buildings already in service. We assess how a building actually performs, then recommend tuning of systems and operations to improve comfort, cut energy waste, and extend equipment life, without relying on capital-heavy assumptions.

Assessments

Building performance assessments

A whole-building look at how systems are operating and where performance is being lost.

HVAC operational reviews

Focused evaluation of HVAC operation, sequences, and setpoints against how the building is actually used.

Deferred maintenance assessments

A clear picture of accumulated maintenance needs and the risk they carry.

Facility condition assessments

An owner-side review of building systems and their condition to drive maintenance planning and capital budgeting: an operational deep-dive, where a transaction PCA is a point-in-time snapshot.

Optimization & efficiency

Chilled water optimization

Operational review and tuning recommendations for chilled-water production and distribution; sequence changes affecting design intent are coordinated with the engineer of record.

Airside optimization

Operational review and recommended adjustments for air-handling and distribution (pressures, resets, and economizer operation), implemented by your staff or controls contractor.

Controls optimization

Analysis of control sequences and setpoints with recommended adjustments so equipment runs only as hard as the building needs.

Energy audits

ASHRAE-style energy audits (Level 1–2): we assess energy use, identify efficiency opportunities, and estimate potential savings for your evaluation; figures are planning estimates.

Utility cost reduction

Analysis identifying operational and efficiency opportunities to lower utility spend; any savings figures are estimates for planning.

Investigations

Comfort investigations

Root-cause investigation of hot, cold, drafty, or inconsistent spaces occupants complain about.

IAQ investigations

Assessment of ventilation and indoor-air-quality concerns and the conditions driving them.

What to expect

A scope tied to useful, concrete outputs.

The exact activities and deliverables are defined in writing for your building. A typical existing buildings engagement draws from the following.

Typical outputs

  • A findings or investigation report tied to observed conditions
  • Prioritized operational, tuning, maintenance, or capital recommendations
  • A clear record of supporting data, field observations, and next steps

Common inputs

  • Available drawings, sequences, O&M records, and maintenance history
  • A site walkthrough, operator interviews, and relevant spot measurements
  • Utility or building-automation data when it is available and useful

Let's talk about your building.

Tell us what you're trying to accomplish. We'll follow up to scope a fit.

AI assistant

Service and project guidance

AI-generated guidance may be inaccurate. Don't share confidential building or project information. See our privacy notice.

Hi—I'm FAST BPC's AI assistant. Ask about our services, coverage, or the right next step for your building. I can also help you prepare a note for our team.